Friday, 8 February 2013

New Production Plan:

Due to the change of Artist everything is now last minute so I am hoping to get as much as I can done as quickly as possible but to a good standard so I will be able to edit the footage I have already got without having to rush it and will have enough time to re-shoot anything if I need to, as well as have a decent amount of time to design my digi-pac and magazine advert.

Tuesday 5th February

I will shoot the cheating scene as well as the cough scene at my house, I have organised for Ellie to come and do my hair and make up for the day and also shoot the scenes that I am unable to film myself because I am featuring in the video. Both Chris and Nathan will come as they have both said they are free and we can do all the scenes that I need them both for.

Location: My Bedroom and Living Room
People: Chris, Nathan, Ellie and Myself
Costumes: Chris: Jeans // Nathan: Black top, white top and jeans // Myself: Cream jumper, blue stripey shirts, peach jumper and black hot-pants
Props: Electric shock machine
Camera Shots: MS, LS, CU
Shots from Story Board:12,16,19,21,26,34,35,38,40,41,42,43,44,45,46,47,48,49,50,51,52,53,54,55,56


Thursday 7th February

This is the day I am hoping to do the walk/woodland scene which will be the 'home footage'

Location: The Woods
People: Myself and Nathan
Costumes: Nathan: Jeans, leather jacket, plain t-shirt, scarf and hat // Myself: Mac, jeans and any top (will be covered)
Camera shots: CU, MS
Shots from Storyboard: 23,24


Monday 11th February

This is the first day we are back at college after the half term, I am hoping that I will be able to use the theatre to film the scenes of Nathan in the straight jacket, Han was able to film on this day so it will be all the scenes listed below..

Location: College Theatre
People: Myself, Han and Nathan
Costumes: Nathan: Shirt (straight jacket), jeans and normal shoes // Han: Lab coat, skirt and shirt
Props: Chair, clip board, pen and table
Camera Shots: LS, MS, CU, ECU
Shots from Storyboard: 1,2,3,4,5,6,7,8,15,18,29,30,31,33


Tuesday 12th Februaury

I have a free afternoon on a Tuesday so on this day I plan to upload all the footage I have already got and start editing it, that way I will know whether anything else needs re-shooting and what else might need to be done, so that next time people are free to film, I can also get whatever else might need doing again/instead of what I have already got.


Wednesday 13th Februay

I will use this day to do some more editing again as I dont think that I will have enough time on the Tuesday alone to do all the editing of the footage I will have filmed.


Friday 15th February

Because people are unable to film for a while, I will design my digipacs, I am planning to make 5 different designs for the front cover and then depending on what feedback the audience give back on those designs, I will start to think about what I will do for the rest of the pac, using there input so I know what the audience would want to see on the digipac.

Monday 18th February

I will use this day to do more editing and will hopefully finish my first draft by the end of the day.


Tuesday 19th February

I am planning to use this day to write about my first draft and see what needs re-shooting, doing differently, whether everything fits well together etc.


Friday 22nd February

I an hoping on getting the last left over shots on this day and complete my filming and re-shoot any shots that need re-shooting. This way I will be able to focus on the digipacs, advert and finishing my music video, then I will be able to focus on finishing my final video.

No comments:

Post a Comment